What is the maximum capacity?
Blue Current charge points can charge at 22kWh, i.e. 32 Ampères over 3 phases.
The charging speed is dependent not only on the charge point but also partly on:
- the capacity of the fuse box
- the charging speed of the car
Most cars nowadays can charge at 3 phases 16A (11kW). It is important that the installation is suitable for 3 phases if you want to actually charge at that speed.
In most cases it is necessary to have load balancing if you would like to charge at maximum speed, read more about load balancing here.