- Charge point
- Requirements
What requirements should the fuse box meet?
What changes must be made to the fuse box before the charge point is installed?
To safely install a charge point, your meter box needs to be modified. The installer installs:
- A separate earth leakage switch
- A group switch specifically for the charge point
In addition, the fitter lays a power cable and a data cable from the meter box to the charge point. This ensures that the charge point can operate safely and smartly.
Don't worry: our technicians take care of all this for you during installation.To safely install a charge point, your meter box needs to be modified. The installer installs: